Multiple Choice
A storage area network (SAN) was inadvertently powered off while power maintenance was being performed in a datacenter. None of the systems should have lost all power during the maintenance. Upon review, it is discovered that a SAN administrator moved a power plug when testing the SAN's fault notification features. Which of the following should be done to prevent this issue from reoccurring?
A) Ensure both power supplies on the SAN are serviced by separate circuits, so that if one circuit goes down, the other remains powered.
B) Install additional batteries in the SAN power supplies with enough capacity to keep the system powered on during maintenance operations.
C) Ensure power configuration is covered in the datacenter change management policy and have the SAN administrator review this policy.
D) Install a third power supply in the SAN so loss of any power intuit does not result in the SAN completely powering off.
Correct Answer:

Verified
Correct Answer:
Verified
Q15: A security analyst is reviewing the following
Q16: During routine monitoring, a security analyst discovers
Q17: An organization is assessing risks so it
Q18: A product manager is working with an
Q19: A custom script currently monitors real-time logs
Q21: An executive assistant wants to onboard a
Q22: An analyst performs a routine scan of
Q23: Which of the following would a security
Q24: A cyber-incident response analyst is investigating a
Q25: An analyst is participating in the solution