Multiple Choice
A project facilitator is working within a large project team that includes 36 members representing different organizational groups. The current communications plan calls for full status updates to be emailed to the whole group twice per week. Which of the following factors should be considered FIRST when communicating with this group?
A) Providing all parties with frequent updates keeps the team on the same page as the project moves forward.
B) The large team may be dispersed over different time zones, preventing the team from receiving the status updates at the same time.
C) The frequency, method, and level of detail provided should be different for each target audience.
D) All team members receive the same level of detail, ensuring the accuracy of the status updates
Correct Answer:

Verified
Correct Answer:
Verified
Q144: Which of the following describes KPIs?<br>A) Analyses
Q145: Which of the following organization types requires
Q146: A project manager is providing the lessons
Q147: A project in the execution phase is
Q148: Which of the following is a characteristic
Q150: A project is about to begin the
Q151: Which of the following project management roles
Q152: A project manager noticed the development team
Q153: Which of the following documents serves the
Q154: The project schedule performance index is 1.1,