BIM
A) is Building Information Management
B) is best with input during the design phase from critical trades
C) is the way construction has always been successful
D) helps cost but often lengthens the schedule
Correct Answer:

Verified
Correct Answer:
Verified
Q13: In Design-Bid-Build, the Owner usually has a
Q14: A special purpose vehicle is created specifically
Q15: Since the Design Builder is liable for
Q16: Design-Bid-Build<br>A) can cause adversarial relationships between Owner,
Q17: An advantage of Design-Bid-Build is<br>A) it usually
Q18: In Design-Bid-Build, the roles of the parties
Q19: IPD relies upon full and open communication
Q21: Multi-prime Contracting<br>A) is hazardous<br>B) usually improves the
Q22: Construction Managers do not assume the risk