Multiple Choice
In this method approx. total length of walls is found in running metre and this total length multiplied by the rate per running metre of wall gives a fairly accurate cost.
A) annual repair
B) item rate estimate
C) approximate quantity method estimate
D) cubical content estimate
Correct Answer:

Verified
Correct Answer:
Verified
Q2: Cube rate estimate is less accurate as
Q3: In reverse engineering, what refers to the
Q4: Which model is used to compute the
Q5: In this method, it is assumed that
Q6: _tendering is used when all the information
Q7: What is the full form of ITA-2000?<br>A)information
Q8: Obsolescence is the annual periodic payments for
Q9: Approximate cost of a hostel building for
Q10: _involves the preparation of tenders based on
Q11: Scrap value is the net annual letting