For the Buehler Bakery, the desired output for a 8 hour workday is 450 units. The discrete tasks required to produce the product have been identified, timed in seconds, and ordered as indicated in the table.
-Calculate the minimum number of assembly line work centers.
A) 7
B) 6
C) 5
D) 4
E) 3