Multiple Choice
ADAMS Electricals has decided to analyze the job flow of their shop to see if a more effective layout can be designed to reduce average job lead time. They have 6 processing departments in the shop, positioned as shown below. The vertical distance between departments is 30 feet while the horizontal distance is 45 feet. Assume that diagonal moves are not possible.
For a typical day, the number of jobs moving from one department to the next is shown in the matrix below.
-When a job moves from Department C to Department D, how much distance does the job travel?
A) 30 feet
B) 45 feet
C) 75 feet
D) 90 feet
E) 120 feet
Correct Answer:

Verified
Correct Answer:
Verified
Q11: Use the Cluster-first-route-second heuristic for two trucks
Q12: Use the Cluster-first-route-second heuristic for two trucks
Q13: Use the Cluster-first-route-second heuristic for two trucks
Q14: ADAMS Electricals decided to analyze the job
Q15: For the Buehler Bakery, the desired output
Q17: Assume a facility is open 8 hours
Q18: William is considering a dispatch rule to
Q19: Assume that all of the jobs below
Q20: Use the Cluster-first-route-second heuristic for two trucks
Q21: Assuming that the customers are ranked in