Multiple Choice
Match these items.
-System's constraint
A) Ensures that components that have been through constrained resources are not delayed
B) Decouples the constrained resources from being directly dependent on the work center
C) Increasing the capacity of the constrained resource
D) Inventory
E) Policy
F) Doesn't contribute to system's goals
G) Modifying resource constraints
H) Contributes to the goals of the system
I) Maximizing throughput through the management of system constraints
J) Protecting orders after the final processing step
Correct Answer:

Verified
Correct Answer:
Verified
Q40: The buffer used to ensure that components
Q41: Which of the following statements is true
Q42: Disruptions to systems can generally be measured
Q43: The phenomenon of increasing impact from statistical
Q44: Match these items.<br>-Activation<br>A) Ensures that components that
Q45: Identifying ways to use a constrained resource
Q46: Match these items.<br>-Elevation<br>A) Ensures that components that
Q47: Match these items.<br>-Time buffer<br>A) Ensures that components
Q48: Currently the major bottlenecks at a manufacturing
Q49: Match these items.<br>-Constraint Management<br>A) Ensures that components