Multiple Choice
Match these items.
-Protective capacity
A) When demand and design capacity are equal
B) Planned with a specific output level
C) Uses production level changes to match changes in demand
D) Is completed at the component level
E) Recognizes the role constraints play in productive systems
F) Uses inventory and variable labor to cope with demand fluctuations
G) May result in an overbooking policy
H) Uses the master production schedule as the source of product demand information
I) Used to add flexibility to operations
J) Uses finished product inventory to deal with demand fluctuations
Correct Answer:

Verified
Correct Answer:
Verified
Q38: Match these items.<br>-Aggregate planning<br>A) When demand and
Q39: Services that have high fixed costs and
Q40: The use of contingent workers can<br>A) Reduce
Q41: Rough-cut capacity planning:<br>A) Utilizes the planned order
Q42: A local bank has been using a
Q44: For _, a breakdown for a short
Q45: Purchased components can indirectly affect manufacturing capacity
Q46: At the _ _ _, cost per
Q47: ABC copier is located in downtown
Q48: For a hotel, the best overbooking policy