True/False
A kaizen workshop is a one-week marathon of tearing down an entire department and completely re-designing its processes.
Correct Answer:

Verified
Correct Answer:
Verified
Q28: Match these items.<br>-A workforce-focused waste reduction technique<br>A)
Q29: _ _ typically requires that equipment be
Q30: Reduced changeovers is a necessary pre-requisite to
Q31: Match these items.<br>-A facility-focused waste reduction technique<br>A)
Q32: Match these items.<br>-An enterprise-wide waste reduction technique<br>A)
Q34: Match these items.<br>-Focus of lean systems<br>A) Producing
Q35: For U.S. manufacturers that have embraced lean
Q36: The seven categories of waste have substantial
Q37: A high-volume producer of custom-printed T-shirts needs
Q38: A producer of electronic components uses tote