Multiple Choice
Match these items.
-A facility-focused waste reduction technique
A) Producing items before they are needed
B) Quality management
C) Continuous improvement
D) Reduced changeover times
E) Cross-training
F) Eliminating non-value added steps in processes
G) Visible record or signal
H) U-shaped production lines
I) Eliminating waste
J) Increased preventive maintenance
Correct Answer:

Verified
Correct Answer:
Verified
Q26: The primary objective of lean systems is
Q27: The lean system philosophy of continuous improvement
Q28: Match these items.<br>-A workforce-focused waste reduction technique<br>A)
Q29: _ _ typically requires that equipment be
Q30: Reduced changeovers is a necessary pre-requisite to
Q32: Match these items.<br>-An enterprise-wide waste reduction technique<br>A)
Q33: A kaizen workshop is a one-week marathon
Q34: Match these items.<br>-Focus of lean systems<br>A) Producing
Q35: For U.S. manufacturers that have embraced lean
Q36: The seven categories of waste have substantial