Multiple Choice
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.
-Finalize permit procedural flow
A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Correct Answer:

Verified
Correct Answer:
Verified
Q55: The ????section of the bid package might
Q56: Match the description with the terms listed.Terms
Q57: Final as-built drawings are submitted to????<br>A) Give
Q58: Which of the following is not typically
Q59: Identify the person responsible for the following
Q61: Identify in which listed project phase each
Q62: The???? is the maximum amount of time
Q63: Value engineering can best be described as????<br>A)
Q64: Match the letter in the project control
Q65: Which of the following would not be