Multiple Choice
In which of the design phases listed would cost savings ideas be most easily implemented and have the greatest potential for project cost savings?
A) Conceptual
B) Detailed design
C) Procurement
D) All phases have equal potential
Correct Answer:

Verified
Correct Answer:
Verified
Q111: In the construction management approach, the construction
Q112: The???? has the final say in decisions
Q113: The ????estimate would be prepared during a
Q114: The term fast track means????<br>A) Design/build<br>B) Construction
Q115: A construction network schedule shows????<br>A) The order
Q117: Match the description with the terms listed.Terms
Q118: A detailed estimate is made with almost
Q119: Identify in which listed project phase each
Q120: Which curve listed would best serve as
Q121: The time for completing a project is