True/False
A detailed estimate is made with almost no information on the project and is the summation of the cost of the individual elements of construction, using unit costs.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q113: The ????estimate would be prepared during a
Q114: The term fast track means????<br>A) Design/build<br>B) Construction
Q115: A construction network schedule shows????<br>A) The order
Q116: In which of the design phases listed
Q117: Match the description with the terms listed.Terms
Q119: Identify in which listed project phase each
Q120: Which curve listed would best serve as
Q121: The time for completing a project is
Q122: The ????design phase is complete when the
Q123: Cost control can be approached as