What is (are) the benefits of meeting with local contractors prior to developing a project bid package?
A) Determine bidder interest
B) Learn about local trade jurisdictions
C) Learn about local building codes
D) Meet local labor pool
E) All of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q5: The ????type of schedule is graphically simple,
Q6: Identify in which listed project phase each
Q7: The architect is most heavily involved during
Q8: In a Design/Bid/Build contractual arrangement, the architect
Q9: In what project phase are the bid
Q11: Which of the estimates listed would occur
Q12: In a guaranteed maximum price contract, costs
Q13: In reporting, a variance can best be
Q14: Owner involvement is highest during what project
Q15: In CPM the steps or operations necessary