Multiple Choice
In a Design/Bid/Build arrangement, a (an) ????contract is most likely used between a general contractor and an owner.
A) PCM
B) Owner-build
C) Lump sum
D) Turnkey
Correct Answer:

Verified
Correct Answer:
Verified