Multiple Choice
In low-contact systems, capacity should be set ________ the average level of demand, while in high-contact systems managers must plan to meet ________ demand.
A) less than; peak
B) more than; peak
C) equal to; average
D) equal to; peak
E) less than; average
Correct Answer:

Verified
Correct Answer:
Verified