Multiple Choice
For certain public projects such as building a dam on a river or a bridge to an island, what procedure is a government likely to use to determine what quantity of a public good should be supplied?
A) It conducts public surveys to determine if consumers want the product.
B) It checks to see what current spending can be eliminated, and how much of the public good can be supplied from the spending cut.
C) It takes a vote in Congress.
D) It evaluates the costs and benefits of producing the good.
Correct Answer:

Verified
Correct Answer:
Verified
Q200: Which of the following is an example
Q201: Economists argue that the level of pollution
Q202: Figure 5-9<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB4193/.jpg" alt="Figure 5-9
Q203: Which of the following displays these two
Q204: The basic cause of deadweight losses from
Q206: Figure 5-2<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB4193/.jpg" alt="Figure 5-2
Q207: Private costs<br>A)are borne by producers of a
Q208: Figure 5-2<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB4193/.jpg" alt="Figure 5-2
Q209: The marginal private cost of a good
Q210: If there is pollution in producing a