Essay
A task involves positioning two metal parts with a rubber gasket sandwiched between them, inserting two bolts into predrilled holes, threading a nut onto each bolt, and tightening each bolt with a pneumatic wrench. In a preliminary study, the manager observed one of his workers perform this task five times. The observations were made in an air-conditioned, well-lighted training facility, at ground level, with all tools and equipment clean and readily available.
a. What is the average observed time for this task?
b. What is the normal time for this task if the employee worked at a 10% slower pace than is typical for adequately trained workers?
c. What is standard time for this task if allowances are 8% constant and 6% variable?
Correct Answer:

Verified
Note that the fourth time must be discar...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q72: Which of the following techniques may not
Q73: Labor specialization includes the development of specialized
Q74: Suppose that an analyst takes 50 samples
Q76: In a stopwatch time study, the average
Q78: In a preliminary work sample of an
Q79: Most pit crew members have background experience
Q80: Which of the following statements regarding incentive
Q81: A Methods and Measurements Analyst needs
Q82: "Designed to show economy of motion by
Q189: Equitable pay alone cannot achieve a reasonable