Multiple Choice
Consider the following work breakdown structure:
What is the estimated standard deviation in the time for activity E?
A) 0 weeks
B) 1 week
C) 2 weeks
D) 3 weeks
E) 4 weeks
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q8: Which of the following are limitations of
Q9: Consider the following work breakdown structure: <img
Q10: In order to determine the probability of
Q11: A method used for establishing a logical
Q12: Consider the following work breakdown structure: <img
Q20: Gantt charts are most closely associated with<br>A)JIT.<br>B)PERT.<br>C)MRP.<br>D)MRPII.<br>E)Six
Q28: The probability of occurrence of risk events
Q38: In a project network, the critical path
Q88: Activity C has an early start time
Q101: The standard deviation of the critical path