Multiple Choice
Process charts bring up the possibility of replacing older,larger,and slower machines with newer,smaller ones having faster processing rates.If the proper machines are chosen to be replaced,this could decrease the size of the waiting lines,also called
A) WIP.
B) SIP.
C) CEO.
D) TMP.
Correct Answer:

Verified
Correct Answer:
Verified
Q2: A cutting tool has a lifetime that
Q3: Process managers are responsible for the production
Q4: _ is defined as setups that take
Q5: _ is the stream of revenue spent
Q6: The method of finding the best,called benchmarking,is
Q7: _,founder of Japanese manufacturing methods,stated,"The prosperity of
Q8: _ is credited has having developed benchmarking
Q9: _ is required to repair equipment when
Q10: Discuss the two ways process redesign can
Q11: _ process charts can be used as