True/False
The costs of not making the best possible assignments of a set of jobs to facilities and vice verse are opportunity costs.
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q99: What are the advantages of the assignment
Q100: On the Gantt load chart,bars and lines,running
Q101: Profit opportunity cost is the cost of
Q102: The span of protection in TOC is
Q103: Loading assigns work at the facilities and
Q105: When the SMH index is multiplied by
Q106: The bottleneck's processing rate is called _
Q107: If jobs are the rows and facilities
Q108: Bottlenecks need to be taken into account,and
Q109: The matrix of total costs per day