Multiple Choice
On the Gantt load chart,bars and lines,running _____ convey various kinds of information designed to help the department schedule its production needs.
A) left to right
B) right to left
C) top to bottom
D) bottom to top
Correct Answer:

Verified
Correct Answer:
Verified