  5. Question
    Flow Control Can Result in Smaller Lot Sizes Being Made
Solved

Flow Control Can Result in Smaller Lot Sizes Being Made

Question 84

Question 84

Multiple Choice

Flow control can result in smaller lot sizes being made more often.This is called


A) drum-buffer-rope.
B) time buffer theory.
C) finite scheduling.
D) continuous scheduling.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Q79: Statement A: Bottlenecks are not caused by

Q80: When there are many jobs and facilities,sequencing

Q81: The flow shop system is pre-designed to

Q82: When the British refer to a billion

Q83: The matrix of costs per part for

Q85: FIFO is an appealing sequencing policy because

Q86: The rows in the Gantt load chart

Q87: _ developed resource plans based on forecasts

Q88: Shifting of job requirements can lead to

Q89: The chart that reserves specific times at

Examlex

ExamLex

About UsContact UsPerks CenterHomeschoolingTest Prep

Work With Us

Campus RepresentativeInfluencers

Links

FaqPricingChrome Extension

Download The App

Get App StoreGet Google Play

Policies

Privacy PolicyTerms of ServiceHonor CodeCommunity Guidelines

Scan To Download

qr-code

Copyright © (2025) ExamLex LLC.

Privacy PolicyTerms Of ServiceHonor CodeCommunity Guidelines