Multiple Choice
Engineering design will be the preferred method for line-balancing
A) if the product or service output of the flow shop is expected to have a long and stable life cycle.
B) if the supplier inputs to the flow shop are expected to have a long and stable life cycle.
C) if the product or service output of the flow shop is expected to grow significantly as the product life cycle matures.
D) all of the above
Correct Answer:

Verified
Correct Answer:
Verified