Multiple Choice
______ is a form of line process scheduling in which many of the scheduling decisions are predetermined when the production systems are designed.
A) Cluster scheduling
B) Job-shop scheduling
C) Flow-shop scheduling
D) Batch scheduling
Correct Answer:

Verified
Correct Answer:
Verified