Multiple Choice
Which of the following statements is FALSE about bottleneck operation?
A) The bottleneck resource should never be kept idle.
B) The bottleneck resource should always be fully staffed.
C) The bottleneck resources should be used to support the nonproductive resources.
D) Production should be synchronized based on the requirement of the bottleneck operation.
Correct Answer:

Verified
Correct Answer:
Verified
Q22: A scheduling system for a service organization
Q23: Which of the following is FALSE about
Q24: _ is a planning and scheduling method
Q25: Critical ratio (CR)= 1 implies _.<br>A)the job
Q26: Schedules may have to be revised frequently
Q28: Scheduling decisions are typically _ in scope.<br>A)extensive<br>B)widespread<br>C)narrow<br>D)broad
Q29: For bottleneck operations the process batch size
Q30: _ is the process of making specific
Q31: _ scheduling represents a significant challenge in
Q32: Computerized short-term scheduling is often referred to