Multiple Choice
______ is a planning and scheduling method that assumes that within any manufacturing system there are a limited number of scarce resources,and they control the overall output of that system.
A) Finite capacity scheduling
B) Advanced planner and optimizer (APO)
C) Manufacturing execution system (MES)
D) Drum-buffer-rope (DBR)
Correct Answer:

Verified
Correct Answer:
Verified