Multiple Choice
For which one of the following reasons is the calculation of overhead variances in conjunction with an activity-based cost (ABC) system desirable from the standpoint of management?
A) The resulting cost-management system is currently required by generally accepted accounting principles (GAAP) .
B) Such a system would be consistent with the goal of managing activities rather than cost.
C) Such a system is likely to be less costly to design and implement.
D) Far fewer variances would likely be expected under such a system.
E) Conventional systems, though appropriate for a manufacturing setting, are not applicable to the service sector.
Correct Answer:

Verified
Correct Answer:
Verified
Q104: The difference between the total actual overhead
Q105: The difference between the actual fixed overhead
Q106: Bluecap Co. uses a standard cost
Q107: If I = the cost of conducting
Q108: The fixed factory overhead production-volume variance represents:<br>A)
Q110: The most appropriate end-of-period disposition of underapplied
Q111: Gerhan Company's flexible budget for the units
Q112: When implementing a standard cost system, one
Q113: Bluecap Co. uses a standard cost
Q114: Which of the following is not a