Multiple Choice
Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following budgeted information pertains to 2019: During 2019, Bluecap worked 28,000 DLHs and manufactured 9,600 units. The actual factory overhead cost for the year was $14,000 greater than the flexible budget amount for the units produced, of which $6,000 was due to fixed factory overhead. In preparing a budget for 2020 Bluecap decided to raise the level of operation to 90% of capacity (a level it considers to be "practical capacity") , to manufacture 9,000 units at a budgeted total of 27,000 DLHs.
The total budget for fixed factory overhead in 2019 for Bluecap Co., to the nearest whole dollar, was:
A) $230,400.
B) $259,200.
C) $265,200.
D) $276,480.
E) $288,000.
Correct Answer:

Verified
Correct Answer:
Verified
Q108: The fixed factory overhead production-volume variance represents:<br>A)
Q109: For which one of the following reasons
Q110: The most appropriate end-of-period disposition of underapplied
Q111: Gerhan Company's flexible budget for the units
Q112: When implementing a standard cost system, one
Q114: Which of the following is not a
Q115: Intangible attributes often play dominant roles in
Q116: The following information is available from
Q117: Some accountants would argue that any variances
Q118: A deviation from standard because of an