Multiple Choice
Without considering projected demands, what is the minimum possible cycle time for this production line?
A) 54 seconds
B) 14 seconds
C) 12 seconds
D) 10 seconds
E) 4 seconds
Correct Answer:

Verified
Correct Answer:
Verified