Solved

Bluecap Co

Question 128

Multiple Choice

Bluecap Co.uses a standard cost system and flexible budgets for control purposes.The following budgeted information pertains to 2010: Bluecap Co.uses a standard cost system and flexible budgets for control purposes.The following budgeted information pertains to 2010:   During 2010,Bluecap worked 28,000 direct labor hours and manufactured 9,600 units.The actual factory overhead was $14,000 greater than the flexible budget amount for the units produced,of which $6,000 was due to fixed factory overhead.In preparing a budget for 2011 Bluecap decided to raise the level of operation to 90% of capacity,to manufacture 9,000 units at a budgeted total of 27,000 direct labor hours.The standard variable overhead application rate per direct labor hour in 2010 was: A) $4.30. B) $4.50. C) $6.90. D) $9.30. E) $9.60.
During 2010,Bluecap worked 28,000 direct labor hours and manufactured 9,600 units.The actual factory overhead was $14,000 greater than the flexible budget amount for the units produced,of which $6,000 was due to fixed factory overhead.In preparing a budget for 2011 Bluecap decided to raise the level of operation to 90% of capacity,to manufacture 9,000 units at a budgeted total of 27,000 direct labor hours.The standard variable overhead application rate per direct labor hour in 2010 was:


A) $4.30.
B) $4.50.
C) $6.90.
D) $9.30.
E) $9.60.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions