Multiple Choice
Xero Company's standard factory overhead rate is $3.75 per direct labor hour (DLH) ,calculated at 90% capacity = 900 standard DLHs.In December,the company operated at 80% of capacity,or 800 standard DLHs.Budgeted factory overhead at 80% of capacity is $3,150,of which $1,350 is fixed overhead.For December,the actual factory overhead cost was $3,800 for 840 actual DLHs,of which $1,300 was for fixed factory overhead.Assuming the use of a four-way breakdown (decomposition) of the total overhead variance,what is the variable factory overhead efficiency variance for December?
A) $90 unfavorable.
B) $150 unfavorable.
C) $225 favorable.
D) $425 unfavorable.
E) $650 unfavorable.
Correct Answer:

Verified
Correct Answer:
Verified
Q3: Which of the following statements is correct?<br>A)
Q59: You are provided with the following summary
Q73: For internal reporting purposes, it is recommended
Q143: When implementing a standard cost system,one of
Q144: A statistical control chart:<br>A)Sets control limits on
Q145: The following information is available from the
Q148: Which one of the following journal entries
Q149: Neptune Inc.uses a standard cost system and
Q151: Which of the following tools is helpful
Q152: The following information is available from the