Multiple Choice
Finite capacity scheduling
A) is an extension of the theory of constraints.
B) requires that jobs be scheduled whole (they cannot be split) .
C) schedules jobs through a number of work centers, each with one or more machines.
D) has all of the above properties.
Correct Answer:

Verified
Correct Answer:
Verified
Q5: Which of the following is a tactic
Q6: The theory of constraints (TOC)is<br>A) a strategic
Q7: A bottleneck should never be blocked or
Q8: A manufacturing company could increase the output
Q9: Which of the following is a performance
Q11: Critical ratio is<br>A) the ratio of processing
Q12: The preemptive rule in a manufacturing setting
Q13: Under the theory of constraints,throughput is defined
Q14: If the critical ratio of a job
Q15: Which of the following is NOT determined