Multiple Choice
Suppose a firm is using 1500 units of labour and 20 units of capital to produce 100 tonnes of mineral ore.The price of labour is $40 per unit and the price of capital is $1000 per unit.The MPL equals 24 and the MPK equals 600.In this situation,
A) the firm is minimizing its costs.
B) the firm should increase the use of both inputs.
C) the firm could lower its production costs by decreasing labour input and increasing capital input.
D) the firm could lower its production costs by increasing labour input and decreasing capital input.
E) the firm should decrease the use of both inputs.
Correct Answer:

Verified
Correct Answer:
Verified
Q1: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB5441/.jpg" alt=" FIGURE 8-1 -Refer
Q3: In the long run,decreasing returns to scale
Q4: The figure below shows the isocost lines
Q5: Refer to Figure 8-6.Suppose this firm is
Q6: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB5441/.jpg" alt=" FIGURE 8-4 -Refer
Q7: For a firm with only two inputs,capital
Q8: Consider the long-run average cost curve for
Q9: Consider a firm that uses only labour
Q10: TABLE 8-1<br> <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB5441/.jpg" alt="TABLE 8-1
Q11: Assume a firm is using 6 units