Multiple Choice
A production kanban card is used to signal that:
A) work is needed at the work center.
B) work is ready to be moved to the next station.
C) a problem exists.
D) a machine has broken down and needs immediate attention.
E) a machine is ready for preventive maintenance.
Correct Answer:

Verified
Correct Answer:
Verified
Q21: With regard to suppliers, lean systems typically
Q23: Which of the following would not contribute
Q26: Which of the following contributes to the
Q28: In the Toyota Production System, waste and
Q31: Which of the following is not characteristic
Q32: Which of the following is characteristic of
Q60: Although inventories are maintained, the goal of
Q61: A fundamental tenet of the lean philosophy
Q91: A basic requirement for operating with low
Q123: Kanban focuses on specific part numbers; CONWIP