Multiple Choice
Shortest processing time (SPT) rule means:
A) The job with the least processing time is worked on next
B) The job needed at the bottleneck is worked on next
C) The same as Critical ratio
D) None of the above
Correct Answer:

Verified
Correct Answer:
Verified
Q1: Critical Ratio is:<br>A)The ratio of processing time
Q5: Scheduling systems answer which all the following
Q6: Use a Gantt chart to schedule the
Q7: In the language of theory of constraints,inventory
Q8: The overriding problem in batch scheduling is:<br>A)Regulating
Q9: Finite capacity scheduling assumes which of the
Q10: The theory of constraints (TOC)is:<br>A)A strategic technique
Q11: Aggregate planning and scheduling differ in that:<br>A)The
Q16: First come,first served is widely used in
Q17: What are the steps that could be