Multiple Choice
Answer the following question(s) using the information below:
The tool crib at a large manufacturing company is responsible for providing tools to the factory workers on demand.The tool crib has a variable demand.Historically, its demand has ranged from 150 to 250 small tools per day with an average of 200.Diane, the tool crib attendant, works eight hours a day, five days a week.Each order is for one small tool and each small tool takes Diane 2 minutes to retrieve from the bins.
-Diane has been asked to consider plans to add the retrieval of larger tooling fixtures to her duties.She anticipates that there would be an average of 12 tooling fixtures per day requested.Each tooling fixture would take Diane 4 minutes to retrieve.What is the average waiting time, in minutes, if Diane continues to be the only worker that would retrieve the small tools as well as the larger tooling fixtures?
A) 5.0 minutes
B) 10.0 minutes
C) 15.5 minutes
D) 18.5 minutes
E) 31.0 minutes
Correct Answer:

Verified
Correct Answer:
Verified
Q158: The account analysis method estimates cost functions
Q210: Sof-T, Inc.manufactures foam products for upholstery companies.It
Q211: Simple regression analysis provides the means to
Q212: The cost of the personnel department at
Q213: Tri-State Manufacturing expects to spend $800,000 in
Q214: The advantage of the high-low method when
Q216: A learning curve is a function that
Q217: List and describe the assumptions that must
Q219: Multicollinearity exists when which of the following
Q220: Review the following report of the results