Multiple Choice
Orlando Avionics makes three types of radios for small aircraft-model A, model B, and model C. The manufacturing operations are mechanized and there is no direct labor. Manufacturing overhead costs are significant, and Orlando has adopted an activity-based costing system. Direct materials costs per unit for each model are as follows: Orlando has three activities-assembly, materials management, and testing. The cost driver for assembly is machine hours. The cost driver for materials management is number of parts, and the cost driver for testing is the number of units of product. Total costs and production volumes for the year 2012 were estimated as follows:
What is the allocation rate for the Assembly activity? (Please round to the nearest cent.)
A) $7.69 per machine hour
B) $0.60 per machine hour
C) $0.15 per machine hour
D) $6.50 per machine hour
Correct Answer:

Verified
Correct Answer:
Verified
Q39: The cost to improve equipment and processes
Q61: The following four steps are necessary in
Q65: Just-in-time systems are based on a "demand-pull
Q78: Target costing starts with the price that
Q144: Alonzo Company has been experiencing lost sales
Q145: AAA Metal Bearings produces two sizes of
Q146: Archetype Fabrication makes pre-stressed concrete forms for
Q147: Archetype Fabrication makes pre-stressed concrete forms for
Q150: Kenney Company uses activity-based costing to account
Q150: The cost of training personnel is an