Multiple Choice
A worker lifts a 20.0-kg bucket of concrete from the ground up to the top of a 20.0-m tall building.The bucket is initially at rest,but is traveling at 4.0 m/s when it reaches the top of the building.What is the minimum amount of work that the worker did in lifting the bucket?
A) 3.92 kJ
B) 400 J
C) 560 J
D) 4.08 kJ
E) 160 J
Correct Answer:

Verified
Correct Answer:
Verified
Q44: In the figure,two boxes,each of mass 24
Q45: In the figure,two identical ideal massless springs
Q46: A 1000.0 kg car is moving at
Q47: A 1000 kg car experiences a net
Q48: An object attached to an ideal massless
Q49: A force <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB6394/.jpg" alt="A force
Q50: Three forces,F<sub>1</sub> = 20.0 N,F<sub>2</sub> = 40.0
Q51: Two objects,one of mass m and the
Q52: If electricity costs 6.00¢/kWh (kilowatt-hour),how much would
Q53: An object is acted upon by a