In a BIP problem,1 corresponds to a yes decision and 0 to a no decision If there are 4 projects under consideration (A,B,C,and D) and at most 2 can be chosen then the following constraint needs to be added to the formulation:
A) A + B + C + D ≤ 1
B) A + B + C + D ≤ 2
C) A + B + C + D ≤ 4
D) A + B + C + D = 2