Multiple Choice
A line-balancing solution has been developed for the assembly line for fertilizer spreaders at Green Grass, Inc. The desired output rate of 30 spreaders per hour will be achieved. The sum of times for all tasks performed on the line is 1200 seconds for each spreader assembled. Which of the following statements is TRUE?
A) The cycle time is 30 seconds per spreader.
B) The theoretical minimum number of workstations is 10.
C) If the solution calls for 12 stations, the efficiency is 90%.
D) If the solution calls for 11 stations, the efficiency is 80%.
Correct Answer:

Verified
Correct Answer:
Verified
Q60: An assembly line with 28 activities is
Q61: Assembly-Line Balancing Problem-Table 1 below<br>The Florida
Q62: The typical layout of facilities in a
Q63: The typical layout of facilities in a
Q64: John, an operations manager at Clan Corp.
Q66: Virtual teams are empowered work teams that
Q67: In designing _ layouts, one is concerned
Q68: An assembly line with 28 activities is
Q69: Discuss four reasons for conducting a facility
Q70: An assembly-line balancing minimizes the number of