Multiple Choice
For a given cycle time in line balancing, assembly-line efficiency can be increased by _____.
A) speeding the assembly line
B) slowing the assembly line
C) decreasing the number of workstations
D) increasing the number of workstations
Correct Answer:

Verified
Correct Answer:
Verified