Multiple Choice
The bill of material (BOM) for Products A and B are shown below followed by a table of inventory data (called Exhibit 1) . The master production scheduling (MPS) for A calls for 150 units of A to be completed in Week 4 and another 225 units to be completed in Week 5. End item A has a two-week lead time. The MPS calls for 400 units of B to be completed in Week 6. End item B has a one-week lead time. Exhibit 1
____________________________________________________________________
-Using the data given in Exhibit 1, determine the projected on-hand inventory for Item C, beginning in Week 8.
A) 800 units
B) 645 units
C) 155 units
D) 0 units
Correct Answer:

Verified
Correct Answer:
Verified
Q15: If A has a gross requirement to
Q16: Level 3 planning, i.e. detailed planning and
Q17: Which is the most comprehensive solution for
Q18: Define a master production schedule (MPS) and
Q19: An example of aggregation would be an
Q21: Which of the following is NOT TRUE
Q22: Promotion of weekly discount airfares by an
Q23: The bill of material (BOM) for
Q24: Increasing the output rate without changing existing
Q25: After a master production schedule (MPS) is