Multiple Choice
Which is the most comprehensive solution for a firm if a load report shows not enough capacity is available?
A) Revise the bill of materials (BOM) and increase capacity.
B) Change the action bucket.
C) Change the master production schedule (MPS) and add capacity.
D) Rerun materials requirements planning (MRP) .