Essay
Godwin Ltd. produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications). Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. In addition, there is a sustaining process with two activities: providing utilities (plantwide) and providing space. Costs have been assigned to each activity using direct tracing and resource drivers:
Activity drivers for each activity have been identified and their practical capacities listed:
The costs of facility-level activities are assigned using machine hours.
Required:
a.
Identify the activities within each process as unit-level, batch-level, product-level, or facility-level.
b.
Create homogeneous cost pools. Identify the activities that belong to each pool and the activity driver that will be used for computing pool rates.
c.
Build an activity relational (i.e. cost) table.
d.
Compute the cost pool rates.
Correct Answer:

Verified
Correct Answer:
Verified
Q14: Product costs can be distorted if a
Q15: Committed resources<br>A) are supplied as needed.<br>B) are
Q16: Zang Manufacturing Company manufactures two products (A
Q17: More accurate product costing information is produced
Q18: Books Company manufactures and sells two products:
Q20: When selecting an activity driver, a company
Q22: Quint Manufacturing uses an activity-based costing system.
Q24: An activity cost driver is<br>A)a factor that
Q24: Moss Ltd. has the following activities: creating
Q54: Which of the following items would be