Essay
A manufacturing company is using a two-container Kanban system between a downstream (using) and an upstream (producing) work center.Each container holds 25 parts.The using work center can handle 100 parts per day.The average elapsed time for the entire cycle is currently .40 days.The company is concerned about the efficiency of the operation.
a.What is the safety factor for the current operation?
b.What is the maximum authorized inventory for this part?
c.If the number of containers is reduced to one, how many parts must it hold?
d.If the efficiency is changed to .10 and the number of parts per container is increased to 44, how many containers will be needed?
Correct Answer:

Verified
a.
= [KC - d(p + w)] / d(p + w) = [(2)(2...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q10: Single minute exchange of dies (SMED) frees
Q16: Long lead-times and higher work-in-process is most
Q17: In a JIT system, the computer inventory
Q19: Quality at the source requires<br>A)Starting with a
Q19: In lean thinking, waste need not be
Q23: Ford Motor Company has decided to switch
Q25: Total Production Maintenance (TPM)<br>A)Puts total responsibility on
Q26: A company is using a Kanban system
Q54: Lean production is focused on efficiency by
Q77: A clean and organized work area is