Essay
ABC Products produces three products (A, B and C) on three machines. Machines 1 and 2 are available for 40 hours a week and Machine 3 is available for 60 hours a week. Profit contribution and standard production time in hours are given in the following table:
Only one operator per machine is required on Machines #1 and #2. Two operators are required for Machine #3. Therefore, two hours of labor must be scheduled for each hour of Machine #3's time. To restate this requirement, two operators must be scheduled for each hour of Machine #3's operation, as well as one operator for each hour of Machine #1's operation and one operator for each hour of Machine #2's operation. A total of 110 labor hours is available for assignment to the three machines during the coming week. Other production requirements are that Product A cannot account for more than 40% of the units produced and that Product C must account for at least 25% of the units produced.
a. Develop the constraint for the capacity limit of Machine #1.
b. Develop the constraint for the capacity limit of Machine #3.
c. Develop the constraint for the labor capacity limit.
d. Develop the constraint for limiting Product A to no more than 40% of the units produced.
e. Develop the constraint that ensures Product C accounts for at least 25% of the units produced.
Correct Answer:

Verified
a. 0.6A + 2.2B + 1.8C ? 4...View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q3: If Activity C directly precedes both D
Q12: (a month's production) + (beginning inventory) -
Q17: Since price is usually set by market
Q20: The Pacific Computer Company makes two
Q27: Excel solver can handle basic linear programming
Q28: Given the partial project network below and
Q29: A company has normal capacity for 2,500
Q32: Which of the following factors would generally
Q36: The Northwest Flower Company owns a greenhouse,
Q38: Differentiate between a feasible solution and an