Multiple Choice
Without kanbans, the withdrawal and production of materials
A) can continue in a reduced manner
B) will not be well coordinated
C) cannot take place
D) would continue based on historical needs
E) would continue based on forecasted needs
Correct Answer:

Verified
Correct Answer:
Verified