The St. Augustine Corporation originally budgeted for $360,000 of fixed overhead at 100% production capacity. Production was budgeted to be 12,000 units. The standard hours for production were 5 hours per unit. The variable overhead rate was $3 per hour. Actual fixed overhead was $360,000 and actual variable overhead was $170,000. Actual production was 11,700 units. Compute the factory overhead controllable variance.
A) $9,000F
B) $9,000U
C) $5,500F
D) $5,500U
Correct Answer:

Verified
Correct Answer:
Verified
Q22: Financial reporting systems that are guided by
Q109: The following data is given for the
Q110: Compute the standard cost for one hat,
Q111: If the standard to produce a given
Q112: A favorable cost variance occurs when actual
Q113: The formula to compute direct labor time
Q115: The following data is given for the
Q117: <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2013/.jpg" alt=" Calculate the variable
Q118: The following data relate to direct labor
Q119: The St. Augustine Corporation originally budgeted for