Multiple Choice
FlexSteal,marketed as a miracle brush-on sealant and baldness cure,is manufactured at three plants that are struggling to keep up with the demand at the four regional centers.The cost to ship a truckload from each of the existing plants to the regional centers is shown in the table.Note that the capacity and the total demand are both measured in truckloads.
The supply chain manager has explored plant construction costs in two other cities as well as the cost to ship a truckload from each of the plants to the regional centers.The current plan is to build another plant with a capacity of 400 to allow room for sales growth.The construction cost for the new plants and cost to ship to each of the regional centers is shown here.
-What is the constraint associated with Plant 2 for the existing set of plants and regional centers?
A) 120x2P + 88x2A + 103x2D + 93x2L = 400
B) x2P + x2A + x2D + x2L ≤ 400
C) x2P+ x2A + x2D + x2L = 400
D) 120x2P + 88x2A + 103x2D + 93x2L ≤ 400
Correct Answer:

Verified
Correct Answer:
Verified
Q77: How does the model change from the
Q78: FlexSteal,marketed as a miracle brush-on sealant
Q79: Available infrastructure,skill needs and response time mostly
Q80: Assume that total demand in a
Q81: If facilities have higher fixed costs,many local
Q82: Inventory and facility costs increase as the
Q83: Supply chain network design decisions include<br>A)only the
Q84: FlexSteal,marketed as a miracle brush-on sealant
Q85: The facilities in a supply chain network
Q86: Models that minimize total costs are used<br>A)from